As construction progressed, the team began installing the household drainage system—an important step in ensuring the building has a safe and durable sanitation backbone. One hundred percent of the pipework was completed during this phase.






Space was intentionally left for the main drainage channel after consultations with a technician and site lead to manage long-term safety and avoid potential structural issues near the boundary fence. This phase helped set a strong foundation for efficient water flow and future maintenance.